Post Construction

Post Construction Treatment

At Makhdoom Services we also provide post construction treatment service. You can contact us for more details or scroll below.

Post Construction Treatment (Vertical Chemical Barrier):

  • A vertical chemical barrier will be established at the ground floor, both inside and outside the building.
  • The objective is to create a barrier that any termite worker entering or leaving the colony must cross, ensuring their elimination.
  • The building will be divided into segments, and treatment will be conducted according to an approved schedule.
  • Drilling at critical points will be done with minimal damage to ground floor tiles. Hole depth will be 12” with a ½” diameter, spaced 3 feet apart.
  • Chemical solution will be poured at a rate of 4-5 liters per hole.

Special Filler for Cracks:

  • All cracks or crevices around wooden fixtures, walls, or floors will be filled with a special building agent made with Termisol 25EC to prevent termite ingress.

Wood Treatment:

  • All wooden fixtures (door and window frames, false ceiling, paneling, etc.) will be treated with a chemical solution to prevent termite damage.
  • The termiticide solution will be poured behind wooden fixtures, either by removing paneling or through drilling into the fixtures.

Concealed Wiring Treatment:

  • To prevent termite movement through electrical wiring, a water-based solution will be poured into all sockets at ground level.
  • A cotton swab dipped in TermiSol 25EC will be placed on the mouth of electric pipes if necessary.
× How can I help you?