Pre-Construction Method

Pre-Construction Method

We also provide Pre-Construction Method Service. Contact us or scroll below for more details.

Pre-Construction Method:

  • Basement Area (Optional if there is a basement): Spraying a mixture on the basement area and retaining walls at 5 liters solution per square meter.
  • Foundation Stage: Spraying a mixture at the pillar pits along with the side walls at 5 liters solution per square meter.
  • Flooring Stage: Spraying a mixture at the flooring area at 5 liters of the solution per square meter.
  • Surrounding Area: Spraying a mixture at the surrounding area after soiling at 5 liters of the solution per square meter.
× How can I help you?