Epoxy flooring work by Makhdoom Services

MAKHDOOM SERVICES · COMMERCIAL FLOORS

Commercial & Industrial Epoxy & PU Flooring in Lahore

Seamless epoxy and PU (polyurethane) floors for working spaces: pharmaceutical and food production, warehouses and factories, hospitals and clinics, showrooms and offices. The system, thickness and preparation are chosen after a site assessment of your floor, traffic and cleaning routine.

We specialise in commercial and industrial floors.

Rs 2,000 refundable visit charge — refunded/adjusted when you book the work

5-year warranty

Industries we work with

Pharmaceutical facilities

Seamless, coved floors for production, packing, store and lab areas, designed for hygiene-sensitive rooms and frequent wet cleaning.

Food & beverage units

Floors for processing halls, bakeries, dairies and commercial kitchens that are washed down every day.

Hospitals, clinics & labs

Easy-to-clean, joint-free floors for wards, corridors, OT corridors, labs and pharmacies, planned around patient areas.

Showrooms & retail

Decorative and metallic finishes for car showrooms and stores, with work phased around opening hours.

Systems for your site

Solvent-free industrial epoxy

For production halls, warehouses and distribution areas with trolley and forklift traffic.

Self-levelling epoxy mortar

For heavy traffic and impact, and for floors with worn or spalled concrete.

PU-concrete (polyurethane) flooring

For food plants, commercial kitchens, cold stores and pharma wash areas with hot water, steam or freezer temperatures.

Hygienic coved epoxy

A continuous floor with coved skirting at the wall junction, for pharma, food and healthcare rooms that are cleaned often. We share the manufacturer's data sheet with the quotation so your QA team can check it against your own requirements.

Anti-static (ESD) epoxy

For electronics assembly, server rooms and labs.

Decorative & metallic epoxy

For showrooms, retail stores and office reception areas.

Metallic and colour-swirl epoxy finishes for showrooms, offices, reception areas and display spaces.

Epoxy Floor Renewal & Re-coating

Industrial floors wear with traffic, chemicals and cleaning. Many facilities plan a renewal after several years, often around five, depending on use. We renew existing epoxy floors for factories, warehouses, pharma and food units, hospitals and showrooms.

Signs a floor needs renewal

peeling or delaminating coating · cracks and damaged joints · worn traffic lanes · stains that no longer clean off · a surface that has become hard to clean.

How we renew

inspection → removal or grinding of the old coating → concrete and joint repair → new epoxy or PU system and line marking.

Where the site allows, the work can be phased section by section or done on shutdown days, so other areas keep working. The phasing is agreed with you before work starts.

Floor renewal details

A continuous floor surface

Why businesses choose epoxy

  • A seamless, joint-free surface that is easy to clean.
  • Resists oils, fuels and many cleaning chemicals.
  • Built for forklifts and machinery when correctly specified.
  • Line marking and colour zones for walkways, loading bays and storage.
  • 5-year warranty on epoxy flooring work; PU warranty terms written in the quotation.

Matched to traffic & load

Thickness guide

Offices, corridors and light-traffic rooms

Around 2 mm

Warehouses with racking, showrooms and parking

3 mm

High-traffic production halls

4–6 mm

Forklift zones, loading areas, pharma/food halls

6 mm

Thickness is confirmed at your site assessment.

Preparation to curing

How we work

  1. 01

    Site assessment with moisture testing

    Assess the floor, intended traffic and moisture readings.

  2. 02

    Moisture & salt (kallar) treatment

    Treat moisture and salt where needed before coating.

  3. 03

    Surface preparation

    Diamond grinding and levelling to prepare the base.

  4. 04

    Crack & concrete repair

    Repair cracks and damaged concrete before applying the system.

  5. 05

    Primer coat

    Apply the primer to the prepared surface.

  6. 06

    Epoxy body coat and topcoat

    Apply the body coat and topcoat, then allow curing.

Allow about 24 hours before foot traffic and 48–72 hours before forklifts or vehicles; loading early can cause cracking.

Work can be phased by area or scheduled around shifts and weekends, so production or patient areas stay open where possible.

Looking after the finish

Care tips

  • Use normal detergent for cleaning.
  • Avoid acidic cleaners and dragging sharp metal-legged items.
  • Dry the floor after washing.

Questions & answers

Before we visit

Beyond Lahore

Other cities

START WITH YOUR SITE

Get a custom quote for your facility

Send your business name and type, site location, approximate floor area (sq ft), what the floor carries, and 3–5 photos on WhatsApp. We review them, arrange a site assessment and send a written quotation before work starts.

Rs 2,000 refundable visit charge · 5-year warranty · Written quotation

97 Lahore-Kasur Road, Ichhra, Lahore