Pre-Construction Termite Treatment Islamabad: 3-Stage Termisol 25 EC Soil Barrier for New Builds
Both warranties include free re-treatment of the affected area.
Our pre-construction termite treatment Islamabad service protects a new house before deemak can reach it. Builders, architects and new home owners in DHA, Bahria Town, Gulberg Greens, Park View City and B-17 get a 3-stage Termisol 25 EC soil barrier, laid at the foundation, plinth and flooring stages, with a 10-Year Written Warranty (Pre-Construction).
- Stage 1, foundation: trench beds, side walls and column pits are drenched before the first pour.
- Stage 2, plinth: every lift of backfill is treated and the inner plinth walls are coated.
- Stage 3, flooring: an even film is laid over the whole covered area before the floor base goes down.
Phone lines open 10 AM – 8 PM, Monday to Saturday (closed Sunday)
Why New Islamabad Plots Need a Soil Barrier Before the Slab
Much of the new building around the capital sits on cleared farmland, scrub and orchard ground. Old roots under these plots feed subterranean termite colonies for years, and once a house is built on top, the workers travel up through expansion joints, service gaps and the plinth to reach door frames, cupboards and wooden floors. The cheapest moment to stop them is while the soil is still open. After the floor is cast, that chance is gone and only drill-inject treatment is possible.
That is why pre-construction termite treatment Islamabad builders book is planned alongside the construction schedule, not after it. Makhdoom Services has treated homes and buildings since 1982, and the same family-run team now handles new builds across Islamabad and Rawalpindi with field-proven results applied across countless residential and commercial projects.
Who This Service Is For: Builders, Architects & New Home Owners
Our pre-construction termite treatment Islamabad clients fall into three groups:
- Builders and contractors running several plots in DHA Islamabad, Bahria Town or Park View City who need termite work to slot into the pour schedule without delays.
- Architects and site engineers who want a clear stage plan, dosage notes and a written record for each visit to share with the client.
- New home owners building their own house in Gulberg Greens, B-17 or G-13, often from abroad, who want photo updates and a written warranty in hand.
The 3-Stage Termisol 25 EC Soil Barrier
Each stage uses Termisol 25 EC diluted with water on site and applied with pressure sprayers so the solution soaks into the soil instead of running off. Every visit is logged with its date and covered area, so your pre-construction termite treatment Islamabad record is complete for the owner and contractor.
Stage 1: Foundation (Open Excavation)
The first visit of pre-construction termite treatment Islamabad sites happens once excavation is complete: the trench beds, trench side walls and column pits are drenched before any concrete or brick foundation goes in. This creates the first treated layer directly under the load-bearing walls, where termites usually begin their climb.
Stage 2: Plinth (Backfill)
As the plinth is filled, each layer of earth is wetted with the mix while it is spread, and the inner face of the plinth walls is coated. Treating layer by layer stops untreated pockets from forming inside the fill.
Stage 3: Flooring (Under the Floor Base)
After the fill is compacted, a continuous film is laid over the whole covered area, including porch, garage, lobby and servant quarter, just before the floor base or sub-base is laid. Service and conduit entry points get extra solution because they are common termite routes.



Scheduling the Three Visits With Your Site Engineer
Pre-construction termite treatment Islamabad sites move fast, so the visits are planned around your pour dates.
- Share the plan: send the plot size, covered area and expected pour dates on WhatsApp.
- Message before each stage: about three days ahead of the foundation, plinth and floor-base stages, so a crew is booked on the right date.
- Keep the area open: the stage should be ready but not yet covered when the crew arrives.
- Receive the record: date, area and photos for each stage are shared with the owner and contractor.
- Get the warranty: after the third stage, the 10-Year Written Warranty (Pre-Construction) is issued.
10-Year Written Warranty for Pre-Construction Termite Treatment Islamabad
When all three stages are completed by our crew, the structure receives a 10-Year Written Warranty (Pre-Construction). If termites show up in a treated area during that period, we re-treat the affected area free of charge. If a stage was missed and the house is later treated after completion, the 5-Year Written Warranty (Post-Construction) applies instead. The warranty is sent on WhatsApp and handed over as a signed paper copy, which is useful when the house is sold or rented.
Pre-Construction Treatment Across Islamabad Societies
Each society has its own soil and building pattern, and our pre-construction termite treatment Islamabad plan adjusts to it.
DHA Islamabad
Phases 1 to 5 mix finished villas with many plots still under construction. Basements on larger plots get an extra treated line along the retaining walls. See also our DHA Islamabad termite page.
Bahria Town & Bahria Enclave
Sloping plots, terraced lawns and basements mean damp soil, so dosage is planned per level. Read our Bahria Town Islamabad termite page for finished-home advice.
Gulberg Greens & Park View City
Farmhouse-style plots and new housing on former farmland carry heavy root systems, so pre-construction termite treatment Islamabad owners book here covers all three stages, and each stage is dosed for that soil.
B-17 & G-13
Fast-growing blocks with many 5 to 10 marla houses going up at once, where pre-construction termite treatment Islamabad owners book early saves later repairs. Neighbouring excavations disturb colonies, so treating your own soil early is the practical defence.
Pre-construction termite treatment Islamabad work only applies while the soil is open. Already living in a finished home? Visit termite control Islamabad or termite control Rawalpindi for post-construction treatment.
Common Mistakes That Weaken a New-Build Termite Barrier
- Treating only one stage: a single spray at the foundation leaves the plinth fill and floor base untreated, and termites simply move around the treated band.
- Pouring before the solution soaks in: concrete or fill laid over wet ground within minutes can push the solution aside. Our crew agrees a short gap with your site engineer.
- Adding untreated soil later: lawn beds, ramps and boundary fills added after the main build should be treated too, or they become a bridge to the plinth.
- Leaving wood scraps in the fill: shuttering offcuts and roots buried in the plinth are food for colonies. Clear them before Stage 2.
- Skipping the porch and garage: these areas are often poured separately and forgotten, yet they sit right against the main walls.
Avoiding these mistakes is what turns a pre-construction termite treatment Islamabad job into long-term protection for the family that moves in.
What to Share Before the First Visit
To plan the dosage and the three dates, send us on WhatsApp: the plot size in marla or kanal, the covered area per floor, whether there is a basement, the current stage of work, and the contractor or site engineer's number. Photos of the open trenches or plinth help us judge the soil. For architects, a simple ground-floor plan is enough. We then confirm the litres of Termisol 25 EC mix needed for each stage and share a written estimate.
Overseas owners building in DHA, Bahria Town or Park View City can follow every stage through photos and short videos sent after each visit, with the dated record kept for the warranty file.
How Termite Treatment Cost is Calculated in Islamabad & Rawalpindi
There is no single rate card for termite work, because no two buildings need the same amount of product or labour. A site with all three stages still open is planned differently from one where only the floor base is left. Your written quote is built from four factors:
- Plot size and covered area: a 5 marla house in G-13 and a 1 kanal villa in DHA Islamabad need very different volumes of solution. We measure the covered area, the boundary and any basement or annexe.
- Pre-construction or post-construction stage: open soil on a grey structure is treated in three visits as the building rises. A finished home is drilled and injected along every wall base, threshold and door frame, which is slower work per square foot.
- Wood and soil condition: active deemak in chowkhats, cupboards or parquet, damp soil near washrooms and lawns, or old roots on former farmland all add treatment points and local wood treatment.
- Chemical dosage: the litres of Termisol 25 EC mix needed per running foot and per square foot depend on the stage and the soil, so the dosage plan is set after we see your photos or the site.
Send photos or a short video for a free estimate. If a site visit is needed, the Rs 2,000 visit charge is refunded/adjusted in your final bill when you book the job with us.
Pre-Construction Termite Treatment Islamabad: FAQs
When should pre-construction termite treatment in Islamabad start?
Book pre-construction termite treatment Islamabad visits before excavation is complete. The first visit treats the open trenches and column pits before any concrete is poured, so your site engineer should message us about three days ahead of the foundation pour, then again before plinth filling and before the floor base.
Which product do you use for the soil barrier?
Only Termisol 25 EC, a fipronil concentrate diluted with water on site. The mix is sprayed evenly over trench beds, side walls, plinth fill and the area under the floor, following the dosage set for your soil and covered area.
What warranty do I get for pre-construction treatment?
When all three stages of pre-construction termite treatment Islamabad work are completed by our crew, the structure receives a 10-Year Written Warranty (Pre-Construction). If termites appear in a treated area during that period, we re-treat the affected area free of charge. The warranty is shared on WhatsApp and as a signed paper copy.
What if one stage was missed or the floor is already cast?
Once the floor base is laid, soil treatment from above is no longer possible. A finished building is treated with post-construction drill-inject work instead, which carries a 5-Year Written Warranty (Post-Construction). Tell us early which stages are still open and we will plan around them.
Do you work in DHA, Bahria Town, Gulberg Greens, Park View City and B-17?
Yes. We schedule pre-construction visits for plots in DHA Islamabad, Bahria Town and Bahria Enclave, Gulberg Greens, Park View City, B-17, G-13 and the wider Islamabad and Rawalpindi area, with each visit date agreed in advance.
How is the cost worked out without a rate list?
The quote depends on the covered area, the number of stages left, the soil condition on your plot and the litres of Termisol 25 EC mix required. Send the plot size and drawings or photos on WhatsApp for a free estimate. If a site visit is needed, the Rs 2,000 visit charge is refunded/adjusted in your final bill when you book the job with us.
What are your working hours?
Our phone and WhatsApp lines are open Monday to Saturday, 10 AM to 8 PM. Site visits are booked within these days on dates agreed with your contractor.
Related Termite Pages
Learn more about termite biology.
Plan Your Pre-Construction Termite Treatment
Send your plot size and construction stage for a free pre-construction termite treatment Islamabad estimate. Should the crew need to see the site first, the Rs 2,000 visit charge is refunded/adjusted in your final bill when you book the job with us.