Epoxy Flooring for Pharmaceutical Companies in Pakistan

Pharmaceutical plants in Pakistan are judged on hygiene as well as output. Production, packing and storage rooms are cleaned often, sometimes with strong agents. People, trolleys and, in some halls, forklifts share the same surface all day. Open tile joints, cracked concrete or a peeling coating make that routine harder, and give an auditor more to question.

This article explains how a hygienic epoxy floor is usually specified for pharmaceutical companies, how Makhdoom Services' Building Works team approaches the work in Lahore, when a repair or recoat is typically planned, and how the same approach is used in other industries. It is a practical note for plant, engineering and QA managers. It does not replace your own site standards.

Why pharmaceutical rooms need a different kind of floor

A pharmaceutical floor has to do three jobs at once.

First, it should be seamless. Grout lines, open cracks and broken joint edges collect dust and residue. A continuous resin surface has no tile joints. Where the floor meets the wall, coved skirting can be formed so the junction can be cleaned instead of left as a square corner.

Second, it should resist the chemicals you already use, at the strengths and contact times your team uses. Makhdoom Services asks for that list, then shares the manufacturer's technical data sheet with the written quotation so your QA or engineering team can check it. Compliance decisions stay with your QA team. We do not claim certification on your behalf.

Third, it should be straightforward to clean as part of the room's existing routine. Texture is chosen by room: a smoother finish often suits dry corridors and packing halls; a light texture is often used in wash areas where spills are expected.

Colour zones and line marking can be added for material flow, personnel routes and storage. That is a layout choice, agreed during the site assessment.

How this relates to cGMP and DRAP expectations

Pharmaceutical companies in Pakistan operate under their own current Good Manufacturing Practice (cGMP) programmes and under the expectations of the Drug Regulatory Authority of Pakistan (DRAP) for how production and related rooms are kept. Floors sit alongside air handling, changing procedures, equipment and cleaning records.

A resin floor cannot complete a cGMP programme on its own, and no flooring contractor can sign off a plant for DRAP. What the floor can do is support a cleanroom-style or hygiene-sensitive room: a continuous surface, coved details where they are needed, a system chosen for the cleaning agents in use, and a finish your team can keep clean. When we quote, we specify the system for each room and attach the data sheet. Your QA team reviews that against your own standards and audits.

Rooms this work usually covers

Typical areas include production and compounding rooms, packing halls, raw-material and finished-goods stores, quality-control and microbiology laboratories, corridors, airlock approaches and changing areas, and warehouse or dispatch bays attached to the plant.

A dry packing hall, a wash bay and a dispatch dock have different traffic and cleaning routines. The assessment looks at each room rather than applying one coating to the whole building.

Epoxy or PU: which system suits the room?

Most dry production rooms, stores and corridors are served by a hygienic, coved epoxy system. Wash areas that see hot water, steam cleaning or regular temperature changes are often better served by a polyurethane (PU) or PU-concrete system.

Many plants use both, zone by zone. The recommendation is made after the site assessment, once traffic, temperatures and cleaning methods are clear.

The six-step method

After the site visit — including a look at the existing slab, traffic, chemicals and moisture — work on a new or fully renewed floor typically follows six steps.

1. Cleaning. The concrete must be free of dust, oil, old loose coating and other contaminants. Residue left on the slab is a common reason a new coating fails to bond.

2. Repair. Cracks, holes and spalled or broken concrete are repaired first. Expansion joints are treated with a flexible sealant, not with rigid epoxy, so movement in the slab is not locked in. If this step is skipped, defects in the base show through the new surface, or reopen later.

3. Primer. A primer is applied to the prepared concrete so the following coats can bond to the slab. Coverage and type depend on the system specified and on the condition of the base, including any moisture treatment already carried out.

4. Scratch-coat repair. A scratch-coat is a thin resin layer used to fill pinholes, small voids and remaining surface irregularities after the main concrete repairs. It evens the base so the final coat is not left sitting over a pitted or uneven slab.

5. Grinding. Once the scratch-coat has set enough to work on, it is ground to a level profile. This step is what gives the top coat a uniform key. It is also used, on renewal work, to remove failed coating and to prepare sound existing coating where a recoat is the agreed path.

6. Top coat. The finishing coat is applied at the thickness agreed for the room's traffic. Line marking and colour zones, if specified, are added as part of this stage or immediately after, once the surface is ready.

Curing then follows. There is no single clock that fits every site. Temperature, humidity, ventilation and the system specified all affect how long the floor needs before foot traffic, trolleys or forklifts. The written quotation confirms the timing for your rooms. Loading the floor too early can mark or damage the new surface.

Work can be phased room by room, or planned for shutdown days, so other areas stay in use where the layout allows. Access, dust control and the order of rooms are agreed with your engineering team before work starts.

Periodic repair and recoat: planning around five years

Industrial and pharmaceutical floors wear. Traffic lanes lose texture, coatings chip, joints open, and cleaning agents take their toll. Many facilities plan a maintenance or recoat cycle roughly every five years. That interval is a planning guide, not a fixed life span. A hall with heavy forklift traffic or very frequent wet cleaning may need attention sooner. A lightly used corridor may last longer.

Signs that a review is due include peeling or flaking coating, cracks and damaged joints, worn lanes where the concrete is starting to show, stains that no longer clean off, and a surface that has become hard to keep clean.

The next step is not always a full replacement. Local damage on an otherwise sound floor may need only a spot repair. A well-bonded but worn coating may need only a recoat after grinding. If the coating is peeling over large areas, full removal and a new system is usually the more reliable path. The cause matters: moisture in the slab, a system that was too thin for the traffic, or chemicals the original coating was not chosen for, will affect the new work if they are ignored.

Makhdoom Services inspects the floor and sets out the options in a written quotation. The renewal page on this site describes that process in more detail.

Other industries that use the same approach

The same Building Works team specifies epoxy and PU floors for other working spaces, matched to each site rather than copied from a pharmaceutical room.

Food and beverage units — processing halls, bakeries, dairies and commercial kitchens — need joint-free surfaces, careful detailing around drains, and often PU-concrete where hot wash-down or cold rooms are involved.

Textile plants, engineering units, warehouses and factories need load resistance for trolleys, pallet jacks or forklifts, a dust-free surface, resistance to oils and process chemicals where they are present, and line marking for aisles and storage.

Laboratories, hospitals and clinics also call for easy-to-clean, joint-free floors, with work planned around occupied areas.

Showrooms and offices use different finishes, including decorative and metallic systems, and anti-static (ESD) epoxy where electronics or server rooms need it. Those spaces are quoted separately.

How to request a quotation

For a custom quotation, send the following on WhatsApp to 0300-4188502: your business name and type, the site location, a room list with approximate areas in square feet, the cleaning agents you use, what the floor carries (foot traffic, trolleys or forklifts), the current floor type, and three to five photographs. We review them, arrange a site assessment and send a written quotation before work starts.

Hours are Monday to Saturday, 10 AM to 8 PM. The workshop address is 97 Lahore-Kasur Road, Ichhra, Lahore.

Frequently asked questions

Can you work in an operating pharmaceutical plant?

Yes. Work is phased by room or zone. Access, dust control and timing are agreed with your engineering team before starting.

Do you provide coved skirting?

Yes. Coved skirting at the floor-wall junction can be included where the room needs it, and it is listed in the written quotation.

Will the floor meet our cGMP or audit requirements?

We specify a hygienic system for each room and share the manufacturer's data sheet so your QA team can review it against your own cGMP programme and audit requirements. Those decisions remain with your QA team. We do not claim certification on your behalf.

How long before the room can be used again?

Curing depends on site conditions and on the system specified. The written quotation confirms when foot traffic and, later, trolleys or forklifts can return to that room.

How often should we plan a repair or recoat?

It depends on traffic, chemicals and cleaning. Many facilities plan a review after several years, often around five, or sooner where wear is visible. Peeling, cracks, worn traffic lanes and stains that no longer clean off are the usual signs.

Can you renew an old epoxy floor, or only install a new one?

Both. Older floors that are peeling, cracking or hard to clean can be inspected and then repaired, recoated or fully renewed, often room by room around the production schedule.

What should we send to get started?

A room list with areas, cleaning agents, traffic type, current floor type and three to five photos, on WhatsApp 0300-4188502. You can also call that number, Monday to Saturday, 10 AM to 8 PM.