Citi Housing Gujranwala

Termite Control & Deemak Treatment in Citi Housing Gujranwala

Canal-belt soil treatment and pre-construction slab poisoning for Phase 1 & Phase 2 plots. Trusted since 1982.

🛡️ 40+ Years Trusted 📜 10-Year Written Guarantee (Pre-Construction) 🏗️ Pre & Post-Construction Treatment

What is the cost of termite control for a 10 Marla house in Citi Housing Gujranwala?

Pre-construction termite treatment for a 10 Marla plot in Citi Housing Gujranwala typically covers full-slab soil poisoning plus perimeter trench treatment before flooring is laid. Exact pricing depends on plot backfill depth and construction stage, so Makhdoom Services provides a fixed written quote after a free on-site soil inspection.

Pricing on canal-belt plots is driven by three variables that a generic city-wide quote cannot account for: how recently the plot was backfilled with agricultural soil, whether construction has already reached lintel level (which limits access to open trenches), and the plot's proximity to the Upper Chenab Canal drainage channel. A 10 Marla plot at foundation stage is the most cost-efficient point to treat, because the full slab area is still exposed and a single, uninterrupted chemical barrier can be applied in one pass.

Why are new construction plots near Upper Chenab Canal at higher risk of termite infestation?

Plots near the Upper Chenab Canal in Citi Housing Gujranwala sit on a permanently elevated water table, keeping subsoil moisture high year-round — the biggest driver of subterranean termite activity. Combined with leftover organic matter from prior farmland use, canal-belt plots need deeper, denser chemical barrier treatment than inland sectors.

Subterranean termites forage along moisture gradients, not randomly. A canal-adjacent plot effectively advertises itself to a foraging colony through capillary moisture rising through the backfill. This is compounded by the fact that Citi Housing Phase 1 and Phase 2 land was, until recently, active or fallow agricultural fields — meaning root systems, crop stubble, and organic-rich topsoil were mechanically mixed into the backfill during leveling, rather than removed. That combination of moisture and cellulose is precisely what a mature termite colony needs to establish, which is why we treat canal-belt plots at tighter injection spacing than the citywide standard.

When should pre-construction anti-termite soil treatment be done before marble or tile flooring?

Pre-construction soil treatment must be applied after foundation trenches are dug and compacted, but strictly before the damp-proof course, brick flooring base, or marble/tile adhesive layer goes down. Treating after tile installation is far less effective, since the chemical barrier can no longer reach the full slab area.

There are two distinct treatment windows on a Citi Housing build, and missing either one leaves a gap in the barrier: trench and footing stage — chemical soil barrier applied directly to the floor and walls of open foundation trenches, before footing concrete is poured; and post-backfill, pre-DPC stage — after the plot is backfilled and leveled, the entire slab footprint is treated at full depth and spacing immediately before the damp-proof course and flooring base are laid. This is the last point at which 100% of the slab area is still physically accessible. A third, optional pass — perimeter re-treatment after external plaster is complete — seals off any gaps created by plumbing or electrical conduit penetrations through the original barrier.

Ground Conditions & Treatment Protocol

Canal-Belt Hydrology

The Upper Chenab Canal keeps subsoil moisture elevated across Citi Housing's western and central sectors year-round, independent of rainfall. Subterranean termites forage toward moisture, which is why canal-proximate plots consistently show earlier and denser colonization than inland sectors of the same phase.

Backfilled Agricultural Soil (Phase 1 & 2)

Land in these phases was farmland before subdivision. Backfill soil routinely contains root stubble, crop residue, and organic-rich topsoil — conditions that can support an active termite colony before a single brick is laid. This is why Makhdoom Services recommends a soil inspection at the trench-excavation stage, not just at the DPC stage.

Pre-Construction Slab & DPC Treatment Protocol

  1. Trench inspection — visual check of open foundation trenches for mud tubes, termite galleries, or root debris before treatment begins.
  2. Trench and footing barrier — chemical soil treatment applied to trench floor and walls before footing concrete is poured.
  3. Post-backfill horizontal barrier — after backfilling, the full slab area is treated at the specified depth and spacing before DPC and flooring base installation.
  4. Perimeter re-treatment — a treated band around the full building footprint after external plaster and flooring are complete, sealing gaps from utility penetrations. This finishing pass is covered under our 5-year post-construction warranty tier.
  5. Verification and guarantee registration — site sign-off with a written 10-year chemical barrier guarantee (pre-construction slab treatment) and a scheduled annual inspection.

Active Ingredient. Termisol 25 EC is used as the sole treatment agent across the full-slab pre-construction barrier and the perimeter re-treatment pass. As a non-repellent termiticide, foraging termites cannot detect it and carry it back into the colony, producing a transfer (domino) effect that eliminates the nest rather than simply deflecting individual foragers — the same formulation is used at tightened spacing for the exposed perimeter band, giving a hard chemical deterrent at the surface where it matters most.

Property Footprint & Treatment Specification

Warranty terms: Pre-Construction Treatment (full-slab soil barrier before flooring) carries a 10-year written warranty. Post-Construction Treatment (perimeter drill-and-inject on already-built structures) carries a 5-year written warranty.

Property FootprintStructural Risk FactorRecommended Active AgentInjection Depth & SpacingGuaranteed Protection Period
5 MarlaModerate–High — canal-belt subsoil moisture, shallow backfillTermisol 25 EC (full-slab pre-construction barrier)8–10 inch trench depth, 15–18 inch slab spacing10-year written guarantee (pre-construction)
10 MarlaHigh — Phase 1/2 backfilled agricultural soil + canal proximityTermisol 25 EC (full-slab barrier + perimeter re-treatment)8–12 inch depth, 12–18 inch spacing along foundation trenches10-year written guarantee (pre-construction)
1 KanalVery High — largest soil-contact footprint, direct canal-belt exposureTermisol 25 EC full-slab treatment + tightened-spacing perimeter re-treatment10–12 inch depth, 12 inch spacing (tightened for exposure)10-year written guarantee (pre-construction)

Makhdoom Services Citi Housing Gujranwala Field Log

Site: Phase 2, residential plot at lintel level (block reference withheld for client privacy)

Site Condition

Freshly backfilled plot with foundation trenches still partially visible along the northern boundary. Backfill soil showed visible root stubble, and two active mud tubes were found climbing an exposed column base — evidence of a subterranean colony already present in the agricultural-origin soil, not an infestation that arrived after construction began.

Action Taken

Full trench treatment at the exposed footing (10-inch depth, 15-inch spacing) using Termisol 25 EC ahead of the client's mason resuming brickwork, followed by a complete slab pre-treatment before DPC laying. The two mud tube points were treated with a concentrated spot application to disrupt the visible foraging trail back to its source.

Outcome

No re-emergence at the 90-day or 6-month inspection checkpoints. Perimeter re-treatment scheduled at final plaster stage under our standard 5-year post-construction guarantee protocol; the primary full-slab treatment already completed is covered under the 10-year pre-construction guarantee.

Get a Free Citi Housing Gujranwala Termite Inspection

Free on-site soil inspection for pre-construction and post-construction plots across Citi Housing Phase 1 & 2. Written 10-year guarantee on pre-construction treatment, 5-year on post-construction perimeter treatment.

🛡️ Serving Citi Housing Gujranwala since 1982

Makhdoom Services technician drilling for termite treatment injection
Drilling for termiticide injection
Makhdoom Services post-construction termite treatment in progress
Post-construction termite treatment
Makhdoom Services technician applying termiticide spray treatment
On-site termite spray treatment
Scroll to Top